1. Land
- Urban land – 1976 sq m
- Extraurban land – 3256 sq m
- Land – 15000 sq m
- Total land 2.023 ha
2. Constructions
- Sandwich panel hall - 360 sq m (l 12 m, L 30 m, h 6 m) with double glazing
- Hall annexes - concreted, covered, closed on 3 sides
- Sandwich panel hall - 160 sq m (l 8 m, L 20 m, h 5 m) with double glazing
- Shed 180 sq m - concreted, covered, closed on 3 sides
- Miscellaneous parts store - 30 sq m
- Office buildings
3. Equipment
- Mebor woodworking line
1. Log ramp
2. Automatic log loader
3. Mebor sawmill 1100 PRO – 3000 operating hours
4. Mebor multi-blade with 3 blades: 1 fixed and 2 mobile, with laser
5. Automatic conveyors
6. Mebor 7000 pendulum
7. Automatic saw blade sharpening machine
8. 2 deburring systems (11 kW and 5 kW)
- Kenobi Skorpion 500 chipper material feed and discharge belts (10-15 mc./h) 2 sets of knives
- Cuteanu 2 sawmill
- Circular saw with 1 edger blade
- Blade sharpening machine chipper knives
4. Machines
- Caterpillar 409D telescopic loader with 3700 operating hours, with Log grapple, 3 mc bucket and blades
5. Others
- Photovoltaic system – 3 kW with panels and batteries
- Installed power 100-250 kW with separate line from the transformer station
- Yard lighting systems
- 24h/24h video surveillance system with storage for 1 year
- 160 bar log washing plant
- Partially concreted and asphalted yard
- Handover to log suppliers and timber beneficiaries
The price is 600,000 Euros (negotiable)
For additional details, I am always at your disposal.
More photos here